The slope and level detector circuit in a $CRO$ has a delay of $100$ns. The start - stop sweep generator has a response time of $50$ns. In order to display correctly, a delay line of
- $150$ns has to be inserted into the $y$-channel
- $150$ns has to be inserted into the $x$-channel
- $150$ns has to be inserted into both $x$ and $y$-channels
- $100$ns has to be inserted into both $x$ and $y$-channels